+44 (0) 207 118 1748Commercial cleaning across London and Surrey

Builders cleaning, ready for handover

BFA Cleaning cleans at the end of construction, refurbishment and fit-out work across London and Surrey: a builders clean, a sparkle clean and a final handover clean, on their own or as one phased programme.

5.02 Google reviews
  • CSCS-carded teams
  • Method statements and risk assessments
A bright corridor in morning light with a freshly mopped, gleaming floor
Weekends and bank holidays, and short-notice starts when a programme slips.

Accreditations and insurance

SAFEcontractor accreditedCHAS memberConstructionline member
  • £10 million coverPublic liability and employers liability
  • DBS checkedEvery member of staff
  • CSCS cardholdersTrained to work on building sites
  • CIS registeredConstruction industry scheme

From technically complete to presentation ready

Construction leaves dust and residue on every surface, and later trades bring more in. We plan the cleans around the programme.

Dust settles on door tops, shelving, light fittings, pipework, radiators and electrical fittings, and more than one pass may be needed. We clean high to low, then the floors, with care for new flooring.

We bring our own equipment, including industrial vacuums with HEPA filtration, specialist glass equipment and pressure washers where required, so the site only needs to give us access.

Method statements and risk assessments come before the work and waste transfer notes after it. We also help with snagging through targeted re-cleans where agreed; we never replace the contractor’s own snagging process.

What a builders clean deals with

  • Construction dust
  • Plaster and grout residue
  • Paint splashes
  • Stickers and labels
  • Packaging and light debris
  • Internal glazing
  • Window frames and tracks
  • Skirting, doors and frames
  • Kitchens and fitted units
  • Bathrooms and sanitaryware

The three cleans of a handover

Booked singly or as a phased programme. Pick a stage to see what it covers.

Builders clean

Straight after the main works

The first substantial clean, removing the main build-up. It can happen while minor snagging continues.

Removes

  • Debris
  • Construction dust
  • Plaster and grout residue
  • Paint and adhesive marks, where safe
  • Labels, where agreed

Cleans

  • Hard floors and vacuuming
  • Doors, frames and skirting
  • Fitted units
  • Bathrooms
  • Internal windows

Sparkle clean

Near the end of the project

The detailed presentation clean that takes a space from technically complete to presentation ready.

Detail

  • Detailed dusting
  • Final floor cleaning
  • Polished fixtures
  • Chrome and stainless steel

Glass and finish

  • Glazing and mirrors
  • Fingerprints and smears
  • Kitchen and bathroom detailing
  • Remaining labels or protective films, where included

Final handover clean

As close to occupation as practical

Removes what later trades bring back in, so the building is handed over the way it was signed off.

Takes away

  • Footprints
  • Dust
  • Fingerprints
  • Packaging and debris
  • Marks on glass

Then

  • Room-by-room checks against the specification
  • Re-cleans recorded
  • A final review with you, where agreed

Projects we clean

Phased cleaning is possible on managed and multi-floor buildings.

An empty office floor with glass-walled meeting rooms and rows of clean desks
Office fit-outs: work areas, meeting rooms, reception, washrooms, glass partitions and breakout areas.
  • Office fit-outs

    Work areas, meeting rooms, reception, washrooms, glass partitions and breakout areas.

  • Commercial refurbishment

    Offices, retail, hospitality, commercial units, warehouses, education and healthcare buildings.

  • Developers

    Builders and sparkle cleans, show-home and common-area cleaning, and re-cleans after snagging, scheduled around plot releases.

  • Schools

    New teaching blocks, toilet upgrades, corridors and dining facilities, cleaned in half terms, summer holidays and shutdowns.

  • Healthcare

    Clinics and medical offices. Builders cleaning is kept separate from clinical decontamination, and infection-control procedures are specified, never assumed.

How we run a builders clean

Every project starts with a free site survey and ends with an inspection against the agreed specification.

  1. Site assessment

    Size, project stage, access, completion date, surfaces, outstanding works, specialist finishes, waste arrangements, and health and safety.

  2. Initial debris removal

    Disposal responsibilities are agreed in advance.

  3. High-to-low dust removal

    From door tops and light fittings down, so dust is not cleaned twice.

  4. Detailed surface cleaning

    Units, frames, skirting, glazing, kitchens and bathrooms.

  5. Floor cleaning

    With care for new flooring and its finish.

  6. Sparkle and presentation

    Fixtures polished, glass and mirrors cleared of smears.

  7. Quality inspection

    A supervisor checks room by room. Marks that cannot be removed safely are raised with you.

On construction programmes

Working in the construction industry schedules are always changing but BFA is always flexible and willing to accommodate. Professional service and great people to work with.
Richard ReneBFA Cleaning website
Outstanding - always pleased to help at short notice. They do a very professional job, and Paul is always so helpful and supportive. Would recommend to anyone 100% - Top job.
Mr SmithDecember 2021, Trustpilot

Builders cleaning questions

We cover London and Surrey, including Central, South and South West London, Guildford, Woking, Epsom, Kingston, Richmond and Wimbledon.

Opening hours

  • Monday to Saturday24 hours
  • SundayClosed
What does after builders cleaning include?

Removing construction dust, plaster, paint, adhesive, grout and debris from floors, windows, frames, skirting, light fittings and kitchen and bathroom fittings, so the space is ready for occupation or handover.

What is the difference between a builders clean and a sparkle clean?

A builders clean removes the bulk of the mess during or right after the main works. A sparkle clean is the final detailed clean before handover. They can be booked separately or together.

How quickly can you carry out an after builders clean?

Ideally contact us at least a week before the clean is needed. We work weekends and bank holidays and can mobilise at short notice.

Do you bring your own cleaning supplies?

Yes. We need nothing from the site beyond access.

Do you clean commercial projects?

Yes: office fit-outs, retail units, hospitality, school and university projects, industrial facilities and new-build developments, with documentation on completion.

How much does after builders cleaning cost?

It depends on the size of the property, the extent of the works and the finish required. We survey the site for free and quote.

Book a free site visit

Send us the programme and the completion date. We will survey the site and plan the cleans around it.

  • £10 million liability cover
  • DBS-checked staff
  • One named contact

Already a client, or prefer to pick a time yourself? Book a visit in the client portal

Request your visit